Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 丰满人妻A片二区 | 亚洲无码视频在线观看 | 日本A片无码少妇下载免费看直播 | 国产成人毛片一区二区三区 | 少妇人妻一级A毛片无码 | 久久久久国产一区二区三区 | 特级婬片A片AAA毛片咕噜咕噜 | 91人妻人人澡人人爽人人精品 | 黄色三级片中文字幕 | 一本一道久久a久久精品综合蜜臀 | 性~乱~交~精观看 | 四川少妇丰满四川话 | 福利小视频在线观看 | 亚洲精品国产精品乱码 | 日韩中文字幕AV | 苍井空做爰高潮A片久久直播 | 性──交──性──乱欧美老妇人 | 黄色视频高清无码 | 无码人妻精品一区二区三区蜜桃色欲 | 91久久国产综合久久91 | 性色av浪潮av| 国产一区二区三区精品视频 | 亚洲精品久久久久久宅男 | 四川妇女BBBB爽BBBB爽 | 国产精品国产精品国产专区不粉h | 色婷婷一区二区三区久久午夜成人 | 国产精品入口a区精选大量大片 | www.成人四虎污在线 | 桃色视频在线导航观看视频网站 | 国产人妻人伦精品1国产 | 亚洲国产精品欧美久久 | 一级毛片免费在线播放 | 97国产精品视频人人做人人爱 | A∨色狠狠一区二区三区 | 少妇精品无码一区二区免费视频 | 少妇被大狼狗躁a片免费 | 成人做爰A片免费看9.1 | 久久国产乱子伦精品一区二区小说 | 精品少妇无码AV无码专区免费 | 少妇被c 黄 在线网站 |